Project information
The project is situated in an archaeologically significant area, where a range of Bronze Age artifacts and Fulacht fiadh burned mounds were uncovered. In response, extensive measures were taken during the development phase to ensure the preservation of these valuable artifacts. As a result, adjustments were made to the site layout.
Furthermore, because of the presence of the native freshwater mussel population in this region, we developed meticulous construction protocols that are specifically designed to safeguard this endangered species.
Status
This solar farm is currently in the construction phase and is scheduled to be built in 2024.