Roscrea

County Tipperary, Ireland

SIZE
30MW
status
Completed
type
Solar PV

Environmental savings

12,660
Tonnes of carbon saved per year
5,703
Average homes powered per year

Environmental savings

2,100
Tonnes of carbon saved per year
946
Average homes powered per year

Project information

Located alongside the M7 motorway, the solar farm is set to produce a significant 30MW of renewable, carbon-neutral electricity. This innovative project is situated on an old peat bog, which had peat extraction in the past. The Monaincha wind farm operates in close proximity to the site, and a key aspect of our project's development included collaboration with these developers.

As part of our commitment to the community, we've introduced several initiatives, including the creation of ponds and nature walks for the local school. This provides students with a firsthand opportunity to see the coexistence of biodiversity and the synergy between solar farms and nature.

Status

This solar farm is currently in the construction phase and is scheduled to be built in 2024.

Roscrea
52.927096
-7.741322

updates and feedback

Latest news